Installation Guide

Installation Guide

This page provides shower enclosure installation guides and technical notes for construction teams and project partners. Follow our steps for standard installation.

Before Installation

  • Check all glass panels, profiles and hardware against the packing list
  • Verify wall and floor dimensions against the shop drawings
  • Prepare tools: drill, level, screwdriver, silicone gun and measuring tape

Standard Installation Steps

  • Mark profile positions with a level and confirm vertical alignment
  • Fix wall profiles and brackets, then apply waterproof silicone
  • Install the glass panels and secure them with the clamps
  • Fit hinges, handles and magnetic strips, then adjust the door gap
  • Test door movement and sealing, then clean the glass surface

Technical Notes

  • Tempered glass cannot be cut or drilled after production, so all dimensions must be confirmed before installation
  • Use neutral silicone for sealing to protect hardware finishes
  • Keep the protective film on the glass until site work is finished

Full installation manuals are available from our sales team for each product series.

Get In Touch

Request a Project Quote

Tell us about your project requirements. Our team will provide a tailored solution and quotation within 24 hours.

01

Submit your project details

02

Receive tailored quotation

03

Confirm specifications & start production

粤ICP备2026153980号-1